31/2-D-8 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 28.01.1995 to 26.02.1995 (29 days), to 3 400,0 m.
Water depth339,0 m
Total depth3 400,0 m MD
Vertical depth1 586,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud28.01.1995
Completed26.02.1995
OperatorNorsk Hydro Produksjon AS
Position60,8552 N, 3,4455 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-D-8 BY1H same well | 0,0 | 3 800,0 | - | - | 2011 |
| 31/2-D-8 BY2H same well | 0,0 | 4 107,0 | - | - | 2012 |
| 31/2-D-8 BY3H same well | 0,0 | 4 038,0 | - | - | 2012 |
| 31/2-D-8 BY4H same well | 0,0 | - | - | - | - |
| 31/2-D-8 CY1H same well | 0,0 | 8 192,0 | - | - | 2020 |
| 31/2-D-8 CY2H same well | 0,0 | 8 295,0 | - | - | 2020 |
| 31/2-D-8 CY3H same well | 0,0 | 7 632,0 | - | - | 2020 |
| 31/2-D-8 H same well | 0,0 | 1 889,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.