WellplannerNorwegian shelf well data

Fields / Troll / 31/2-D-8 H

31/2-D-8 H

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 14.01.1995 to 27.01.1995 (13 days), to 1 889,0 m.

Water depth339,0 m
Total depth1 889,0 m MD
Vertical depth1 619,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud14.01.1995
Completed27.01.1995
OperatorNorsk Hydro Produksjon AS
Position60,8552 N, 3,4455 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient51 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-D-8 AH same well0,03 400,0--1995
31/2-D-8 BY1H same well0,03 800,0--2011
31/2-D-8 BY2H same well0,04 107,0--2012
31/2-D-8 BY3H same well0,04 038,0--2012
31/2-D-8 BY4H same well0,0----
31/2-D-8 CY1H same well0,08 192,0--2020
31/2-D-8 CY2H same well0,08 295,0--2020
31/2-D-8 CY3H same well0,07 632,0--2020

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗