31/2-E-4 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 23.03.1995 to 25.04.1995 (33 days), to 4 000,0 m.
Water depth332,0 m
Total depth4 000,0 m MD
Vertical depth1 582,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud23.03.1995
Completed25.04.1995
OperatorNorsk Hydro Produksjon AS
Position60,7989 N, 3,4422 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-E-4 AY1H same well | 0,0 | 5 757,0 | - | - | 2015 |
| 31/2-E-4 AY2H same well | 0,0 | 6 039,0 | - | - | 2015 |
| 31/2-E-4 AY3H same well | 0,0 | 5 778,0 | - | - | 2015 |
| 31/2-E-5 AH | 0,1 | 3 070,0 | - | - | 1996 |
| 31/2-E-5 BY1H | 0,1 | 3 561,0 | - | - | 2012 |
| 31/2-E-5 BY2H | 0,1 | 4 176,0 | - | - | 2012 |
| 31/2-E-5 BY3H | 0,1 | 4 451,0 | - | - | 2012 |
| 31/2-E-5 H | 0,1 | 1 885,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.