31/2-E-5 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 09.02.1996 to 22.02.1996 (13 days), to 3 070,0 m.
Water depth332,0 m
Total depth3 070,0 m MD
Vertical depth1 585,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud09.02.1996
Completed22.02.1996
OperatorNorsk Hydro Produksjon AS
Position60,7979 N, 3,4430 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-E-5 BY1H same well | 0,0 | 3 561,0 | - | - | 2012 |
| 31/2-E-5 BY2H same well | 0,0 | 4 176,0 | - | - | 2012 |
| 31/2-E-5 BY3H same well | 0,0 | 4 451,0 | - | - | 2012 |
| 31/2-E-5 H same well | 0,0 | 1 885,0 | - | - | 1996 |
| 31/2-E-4 AY1H | 0,1 | 5 757,0 | - | - | 2015 |
| 31/2-E-4 AY2H | 0,1 | 6 039,0 | - | - | 2015 |
| 31/2-E-4 AY3H | 0,1 | 5 778,0 | - | - | 2015 |
| 31/2-E-4 H | 0,1 | 4 000,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.