31/2-F-5 BY1H
Development, productionClosedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 22.04.2004 to 14.06.2004 (53 days), to 6 703,0 m.
Water depth331,0 m
Total depth6 703,0 m MD
Vertical depth1 588,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud22.04.2004
Completed14.06.2004
OperatorNorsk Hydro Produksjon AS
Position60,7667 N, 3,4241 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-16 S | 0,0 | 2 390,0 | 40 °C | 1,41 | 1989 |
| 31/2-16 SR | 0,0 | 2 391,0 | 67 °C | - | 1991 |
| 31/2-F-5 AH same well | 0,0 | 2 336,0 | - | - | 2004 |
| 31/2-F-5 BY2H same well | 0,0 | 6 098,0 | - | - | 2004 |
| 31/2-F-5 H same well | 0,0 | 2 390,0 | - | - | 1989 |
| 31/2-5 | 0,6 | 2 532,0 | 79 °C | 1,25 | 1980 |
| 31/2-5 R | 0,6 | 2 525,0 | 79 °C | 1,50 | 1981 |
| 31/2-5 R2 | 0,6 | 2 525,0 | 79 °C | 1,50 | 1984 |
Casing and formation tests