WellplannerNorwegian shelf well data

Fields / Troll / 31/2-L-41

31/2-L-41

Development, observationPlugged and abandoned

Drilled by Norsk Hydro Produksjon AS with West Vanguard in Troll, 27.01.1998 to 10.02.1998 (14 days), to 1 708,0 m.

Water depth329,0 m
Total depth1 708,0 m MD
Vertical depth1 707,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud27.01.1998
Completed10.02.1998
OperatorNorsk Hydro Produksjon AS
Position60,8123 N, 3,5806 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient55 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-X-23 Y1H0,84 513,0--2006
31/2-X-23 Y2H0,87 076,0--2006
31/2-X-23 Y3H0,87 230,0--2006
31/2-X-23 Y4H0,8----
31/2-X-24 AH0,84 848,0--2001
31/2-X-24 H0,82 003,0--2001
31/2-X-21 AY1H0,86 415,0--2013
31/2-X-21 AY2H0,86 028,0--2013

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗