Fields / Troll / 31/2-P-11 Y1H

31/2-P-11 Y1H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander in Troll, 11.01.2002 to 26.02.2002 (46 days), to 4 905,0 m.

Water depth337,0 m
Total depth4 905,0 m MD
Vertical depth1 582,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud11.01.2002
Completed26.02.2002
OperatorNorsk Hydro Produksjon AS
Position60,8670 N, 3,5580 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/2-P-11 AY1H same well0,06 151,0--2011
31/2-P-11 AY2H same well0,06 254,0--2011
31/2-P-11 BH same well0,06 300,0--2016
31/2-P-11 Y2H same well0,04 519,0--2002
31/2-P-12 H0,04 502,0--1999
31/2-P-13 AH0,04 309,0--1999
31/2-P-13 BY1H0,05 230,0--2010
31/2-P-13 BY2H0,05 333,0--2010

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗