Fields / Troll / 31/2-P-11 Y2H
31/2-P-11 Y2H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander in Troll, 27.02.2002 to 23.03.2002 (24 days), to 4 519,0 m.
Water depth337,0 m
Total depth4 519,0 m MD
Vertical depth1 582,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud27.02.2002
Completed23.03.2002
OperatorNorsk Hydro Produksjon AS
Position60,8670 N, 3,5580 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-P-11 AY1H same well | 0,0 | 6 151,0 | - | - | 2011 |
| 31/2-P-11 AY2H same well | 0,0 | 6 254,0 | - | - | 2011 |
| 31/2-P-11 BH same well | 0,0 | 6 300,0 | - | - | 2016 |
| 31/2-P-11 Y1H same well | 0,0 | 4 905,0 | - | - | 2002 |
| 31/2-P-12 H | 0,0 | 4 502,0 | - | - | 1999 |
| 31/2-P-13 AH | 0,0 | 4 309,0 | - | - | 1999 |
| 31/2-P-13 BY1H | 0,0 | 5 230,0 | - | - | 2010 |
| 31/2-P-13 BY2H | 0,0 | 5 333,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.