31/2-S-12 H
Development, productionClosedOil
Drilled by Norsk Hydro Produksjon AS with Mærsk Jutlander in Troll, 19.11.2001 to 05.01.2002 (47 days), to 5 305,0 m.
Water depth343,0 m
Total depth5 305,0 m MD
Vertical depth1 590,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigMærsk Jutlander
Spud19.11.2001
Completed05.01.2002
OperatorNorsk Hydro Produksjon AS
Position60,8950 N, 3,6547 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-S-11 AY1H | 0,0 | 5 921,0 | - | - | 2016 |
| 31/2-S-11 AY2H | 0,0 | 7 317,0 | - | - | 2016 |
| 31/2-S-11 AY3H | 0,0 | 7 158,0 | - | - | 2016 |
| 31/2-S-11 BY1H | 0,0 | 8 448,0 | - | - | 2021 |
| 31/2-S-11 BY2H | 0,0 | 8 876,0 | - | - | 2021 |
| 31/2-S-11 BY3H | 0,0 | 6 471,0 | - | - | 2021 |
| 31/2-S-11 H | 0,0 | 5 314,0 | - | - | 2002 |
| 31/2-S-14 AH | 0,0 | 5 010,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.