31/2-S-14 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Vanguard in Troll, 29.07.1998 to 17.10.1998 (80 days), to 5 010,0 m.
Water depth343,0 m
Total depth5 010,0 m MD
Vertical depth1 581,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud29.07.1998
Completed17.10.1998
OperatorNorsk Hydro Produksjon AS
Position60,8950 N, 3,6545 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 49 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/2-S-14 BY1H same well | 0,0 | 5 455,0 | - | - | 2011 |
| 31/2-S-14 BY2H same well | 0,0 | 5 071,0 | - | - | 2011 |
| 31/2-S-14 CY1H same well | 0,0 | 6 033,0 | - | - | 2018 |
| 31/2-S-14 CY2H same well | 0,0 | 6 593,0 | - | - | 2018 |
| 31/2-S-14 H same well | 0,0 | 1 838,0 | - | - | 1998 |
| 31/2-S-13 AH | 0,0 | 4 375,0 | - | - | 1998 |
| 31/2-S-13 H | 0,0 | 1 948,0 | - | - | 1998 |
| 31/2-S-12 H | 0,0 | 5 305,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.