31/4-6
Exploration, appraisalPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Nortrym in Brage, 28.02.1982 to 20.04.1982 (51 days), to 2 447,0 m in the Drake Formation.
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 100 °C |
| Brage gradient | 41,6 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 7 released wells in Brage with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-8 | 1,7 | 2 611,0 | - | 1,40 | 1986 |
| 31/4-U-8 | 2,4 | 49,0 | - | - | 1987 |
| 31/4-U-4 | 2,5 | 91,0 | - | - | 1987 |
| 31/4-U-3 | 2,5 | 128,0 | - | - | 1987 |
| 31/4-A-13 | 2,5 | 3 803,0 | - | - | 1994 |
| 31/4-A-13 A | 2,5 | 4 894,0 | - | - | 2009 |
| 31/4-A-13 B | 2,5 | 4 600,0 | - | - | 2009 |
| 31/4-A-13 C | 2,5 | 7 799,0 | - | 1,55 | 2022 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 243,0 | 36" | 243,5 | - |
| Surface casing | 20" | 913,0 | 26" | 927,0 | 1,68 LOT |
| Intermediate | 13 3/8" | 1 844,0 | 17 1/2" | 1 865,0 | 1,72 LOT |
| Intermediate | 9 5/8" | 2 406,0 | 12 1/4" | 2 447,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 1,34 g/cm³ against measured depth, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 2 159,0 - 2 163,0 | 14,3 | - | - | 452 | 39 000 |