31/4-A-10
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Brage in Brage, 21.08.2001 to 14.11.2001 (85 days), to 4 949,0 m.
Water depth136,9 m
Total depth4 949,0 m MD
Vertical depth2 443,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigBrage
Spud21.08.2001
Completed14.11.2001
OperatorNorsk Hydro Produksjon AS
Position60,5425 N, 3,0474 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Brage gradient | 41,6 °C/km |
| Estimated at total depth from the gradient | 97 °C |
The gradient is the median of 7 released wells in Brage with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-A-10 A same well | 0,0 | 6 120,0 | - | - | 2001 |
| 31/4-A-15 | 0,0 | 4 397,0 | - | - | 1996 |
| 31/4-A-15 A | 0,0 | 8 466,0 | - | - | 2018 |
| 31/4-A-15 B | 0,0 | 10 223,0 | - | - | 2025 |
| 31/4-A-15 C | 0,0 | 10 895,0 | - | - | 2025 |
| 31/4-A-15 D | 0,0 | 10 009,0 | - | - | 2025 |
| 31/4-A-33 | 0,0 | 4 227,0 | - | - | 1998 |
| 31/4-A-33 A | 0,0 | 5 713,0 | - | - | 1998 |
Casing and formation tests
No casing programme is reported for this wellbore.