31/4-A-15
Development, injectionPluggedCuttings
Drilled by Norsk Hydro Produksjon AS with Brage in Brage, 10.05.1996 to 13.06.1996 (34 days), to 4 397,0 m.
Water depth137,0 m
Total depth4 397,0 m MD
Vertical depth2 190,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table62,6 m
Formation at total depth-
RigBrage
Spud10.05.1996
Completed13.06.1996
OperatorNorsk Hydro Produksjon AS
Position60,5425 N, 3,0474 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Brage gradient | 41,6 °C/km |
| Estimated at total depth from the gradient | 87 °C |
The gradient is the median of 7 released wells in Brage with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/4-A-15 A same well | 0,0 | 8 466,0 | - | - | 2018 |
| 31/4-A-15 B same well | 0,0 | 10 223,0 | - | - | 2025 |
| 31/4-A-15 C same well | 0,0 | 10 895,0 | - | - | 2025 |
| 31/4-A-15 D same well | 0,0 | 10 009,0 | - | - | 2025 |
| 31/4-A-10 | 0,0 | 4 949,0 | - | - | 2001 |
| 31/4-A-10 A | 0,0 | 6 120,0 | - | - | 2001 |
| 31/4-A-25 | 0,0 | 2 900,0 | - | - | 1994 |
| 31/4-A-25 A | 0,0 | 5 645,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.