31/5-B-4 H
Development, productionPlugged and abandonedGas
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 29.01.1990 to 25.02.1990 (27 days), to 1 642,0 m.
Water depth302,0 m
Total depth1 642,0 m MD
Vertical depth1 583,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud29.01.1990
Completed25.02.1990
OperatorNorsk Hydro Produksjon AS
Position60,5743 N, 3,6574 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 51 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-B-5 H | 0,0 | 1 670,0 | - | - | 1990 |
| 31/5-B-2 H | 0,0 | 1 661,0 | - | - | 1990 |
| 31/5-B-3 H | 0,0 | 1 673,0 | - | - | 1990 |
| 31/5-U-1 | 0,0 | 70,0 | - | - | 1987 |
| 31/5-U-2 | 0,0 | 115,0 | - | - | 1987 |
| 31/5-B-6 H | 0,0 | 1 681,0 | - | - | 1989 |
| 31/6-8 | 2,3 | 2 138,0 | 79 °C | 1,35 | 1985 |
| 31/6-8 R | 2,3 | 2 138,0 | 79 °C | 1,20 | 1985 |
Casing and formation tests
No casing programme is reported for this wellbore.