31/5-H-3 BH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 03.06.1997 to 22.06.1997 (19 days), to 4 302,0 m.
Water depth316,0 m
Total depth4 302,0 m MD
Vertical depth1 591,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud03.06.1997
Completed22.06.1997
OperatorNorsk Hydro Produksjon AS
Position60,7143 N, 3,5137 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 51 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-H-3 AH same well | 0,0 | 4 630,0 | - | - | 1997 |
| 31/5-H-3 CY1H same well | 0,0 | 5 888,0 | - | - | 2009 |
| 31/5-H-3 CY2H same well | 0,0 | 5 608,0 | - | - | 2009 |
| 31/5-H-3 DY1H same well | 0,0 | 5 379,0 | - | - | 2022 |
| 31/5-H-3 DY2H same well | 0,0 | 7 420,0 | - | - | 2022 |
| 31/5-H-3 DY3H same well | 0,0 | 6 081,0 | - | - | 2022 |
| 31/5-H-3 H same well | 0,0 | 2 377,0 | - | - | 1997 |
| 31/5-H-1 AH | 0,3 | 4 771,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.