31/5-H-4 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 28.06.1996 to 30.07.1996 (32 days), to 3 938,0 m.
Water depth317,0 m
Total depth3 938,0 m MD
Vertical depth1 596,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud28.06.1996
Completed30.07.1996
OperatorNorsk Hydro Produksjon AS
Position60,7153 N, 3,5074 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 51 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-H-4 AY1H same well | 0,0 | 4 297,0 | - | - | 2017 |
| 31/5-H-4 AY2H same well | 0,0 | 6 635,0 | - | - | 2017 |
| 31/5-H-4 AY3H same well | 0,0 | 7 083,0 | - | - | 2017 |
| 31/5-H-4 AY4H same well | 0,0 | 4 718,0 | - | - | 2017 |
| 31/5-H-5 AH | 0,1 | 4 241,0 | - | - | 1995 |
| 31/5-H-5 BY1H | 0,1 | 5 061,0 | - | - | 2012 |
| 31/5-H-5 BY2H | 0,1 | 5 425,0 | - | - | 2012 |
| 31/5-H-5 H | 0,1 | 2 127,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.