31/5-H-5 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 19.11.1995 to 11.12.1995 (22 days), to 4 241,0 m.
Water depth318,0 m
Total depth4 241,0 m MD
Vertical depth1 570,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud19.11.1995
Completed11.12.1995
OperatorNorsk Hydro Produksjon AS
Position60,7145 N, 3,5068 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-H-5 BY1H same well | 0,0 | 5 061,0 | - | - | 2012 |
| 31/5-H-5 BY2H same well | 0,0 | 5 425,0 | - | - | 2012 |
| 31/5-H-5 H same well | 0,0 | 2 127,0 | - | - | 1995 |
| 31/5-H-4 AY1H | 0,1 | 4 297,0 | - | - | 2017 |
| 31/5-H-4 AY2H | 0,1 | 6 635,0 | - | - | 2017 |
| 31/5-H-4 AY3H | 0,1 | 7 083,0 | - | - | 2017 |
| 31/5-H-4 AY4H | 0,1 | 4 718,0 | - | - | 2017 |
| 31/5-H-4 H | 0,1 | 3 938,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.