WellplannerNorwegian shelf well data

Fields / Troll / 31/5-H-6 AH

31/5-H-6 AH

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Treasure Saga in Troll, 24.07.1995 to 21.08.1995 (28 days), to 4 444,0 m.

Water depth318,0 m
Total depth4 444,0 m MD
Vertical depth1 587,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigTreasure Saga
Spud24.07.1995
Completed21.08.1995
OperatorNorsk Hydro Produksjon AS
Position60,7130 N, 3,5094 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-H-6 BY1H same well0,05 263,0--2009
31/5-H-6 BY2H same well0,05 133,0--2009
31/5-H-6 H same well0,02 600,0--1995
31/5-H-5 AH0,24 241,0--1995
31/5-H-5 BY1H0,25 061,0--2012
31/5-H-5 BY2H0,25 425,0--2012
31/5-H-5 H0,22 127,0--1995
31/5-H-3 AH0,34 630,0--1997

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗