31/5-I-21 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 27.05.1998 to 02.07.1998 (36 days), to 5 060,0 m.
Water depth317,0 m
Total depth5 060,0 m MD
Vertical depth1 612,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud27.05.1998
Completed02.07.1998
OperatorNorsk Hydro Produksjon AS
Position60,7286 N, 3,5777 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 51 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-I-21 BY1H same well | 0,0 | 5 327,0 | - | - | 2009 |
| 31/5-I-21 BY2H same well | 0,0 | 5 208,0 | - | - | 2009 |
| 31/5-I-21 CY1H same well | 0,0 | 4 966,0 | - | - | 2015 |
| 31/5-I-21 CY2H same well | 0,0 | 5 350,0 | - | - | 2015 |
| 31/5-I-21 CY3H same well | 0,0 | 5 528,0 | - | - | 2015 |
| 31/5-I-21 DY1H same well | 0,0 | 9 929,0 | - | - | 2022 |
| 31/5-I-21 DY2H same well | 0,0 | 8 677,0 | - | - | 2022 |
| 31/5-I-21 DY3H same well | 0,0 | 8 705,0 | - | - | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.