WellplannerNorwegian shelf well data

Fields / Troll / 31/5-I-21 CY2H

31/5-I-21 CY2H

Development, productionPluggedOil

Drilled by Statoil Petroleum AS with COSLPromoter in Troll, 12.11.2015 to 27.11.2015 (15 days), to 5 350,0 m.

Water depth315,6 m
Total depth5 350,0 m MD
Vertical depth1 584,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPromoter
Spud12.11.2015
Completed27.11.2015
OperatorStatoil Petroleum AS
Position60,7286 N, 3,5777 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-I-21 AH same well0,05 060,0--1998
31/5-I-21 BY1H same well0,05 327,0--2009
31/5-I-21 BY2H same well0,05 208,0--2009
31/5-I-21 CY1H same well0,04 966,0--2015
31/5-I-21 CY3H same well0,05 528,0--2015
31/5-I-21 DY1H same well0,09 929,0--2022
31/5-I-21 DY2H same well0,08 677,0--2022
31/5-I-21 DY3H same well0,08 705,0--2022

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗