31/5-I-23 AH
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 13.04.1998 to 30.04.1998 (17 days), to 4 798,0 m.
Water depth317,0 m
Total depth4 798,0 m MD
Vertical depth1 580,9 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud13.04.1998
Completed30.04.1998
OperatorNorsk Hydro Produksjon AS
Position60,7286 N, 3,5775 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-I-23 BY1H same well | 0,0 | 5 594,0 | - | - | 2019 |
| 31/5-I-23 BY2H same well | 0,0 | 5 372,0 | - | - | 2019 |
| 31/5-I-23 BY3H same well | 0,0 | 6 723,0 | - | - | 2019 |
| 31/5-I-23 H same well | 0,0 | 2 040,0 | - | - | 1998 |
| 31/5-I-21 AH | 0,0 | 5 060,0 | - | - | 1998 |
| 31/5-I-21 BY1H | 0,0 | 5 327,0 | - | - | 2009 |
| 31/5-I-21 BY2H | 0,0 | 5 208,0 | - | - | 2009 |
| 31/5-I-21 CY1H | 0,0 | 4 966,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.