Development, productionClosedOil

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 13.02.1999 to 02.03.1999 (17 days), to 4 501,0 m.

Water depth315,0 m
Total depth4 501,0 m MD
Vertical depth1 621,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud13.02.1999
Completed02.03.1999
OperatorNorsk Hydro Produksjon AS
Position60,7433 N, 3,6081 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient52 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-J-11 H same well0,01 951,0--1999
31/5-J-12 AY1H0,04 850,0--2014
31/5-J-12 AY2H0,04 713,0--2014
31/5-J-12 AY3H0,05 381,0--2014
31/5-J-12 BY1H0,07 404,0--2017
31/5-J-12 BY2H0,06 452,0--2017
31/5-J-12 H0,04 725,0--2000
31/5-J-13 AY1H0,04 556,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.