Fields / Troll / 31/5-J-12 AY3H
31/5-J-12 AY3H
Development, productionPluggedOil
Drilled by Statoil Petroleum AS with Stena Don in Troll, 15.04.2014 to 24.04.2014 (9 days), to 5 381,0 m.
Water depth315,0 m
Total depth5 381,0 m MD
Vertical depth1 584,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigStena Don
Spud15.04.2014
Completed24.04.2014
OperatorStatoil Petroleum AS
Position60,7432 N, 3,6081 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-J-12 AY1H same well | 0,0 | 4 850,0 | - | - | 2014 |
| 31/5-J-12 AY2H same well | 0,0 | 4 713,0 | - | - | 2014 |
| 31/5-J-12 BY1H same well | 0,0 | 7 404,0 | - | - | 2017 |
| 31/5-J-12 BY2H same well | 0,0 | 6 452,0 | - | - | 2017 |
| 31/5-J-12 H same well | 0,0 | 4 725,0 | - | - | 2000 |
| 31/5-J-11 AH | 0,0 | 4 501,0 | - | - | 1999 |
| 31/5-J-11 H | 0,0 | 1 951,0 | - | - | 1999 |
| 31/5-J-14 AY1H | 0,0 | 4 794,0 | - | - | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.