WellplannerNorwegian shelf well data

Fields / Troll / 31/5-J-14 H

31/5-J-14 H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 29.01.2000 to 22.02.2000 (24 days), to 4 778,0 m.

Water depth315,0 m
Total depth4 778,0 m MD
Vertical depth1 580,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud29.01.2000
Completed22.02.2000
OperatorNorsk Hydro Produksjon AS
Position60,7432 N, 3,6079 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient50 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-J-14 AY1H same well0,04 794,0--2011
31/5-J-14 AY2H same well0,04 975,0--2011
31/5-J-14 BH same well0,06 878,0--2015
31/5-J-13 AY1H0,04 556,0--2009
31/5-J-13 AY2H0,04 565,0--2009
31/5-J-13 AY3H0,04 904,0--2009
31/5-J-13 BY1H0,07 292,0--2015
31/5-J-13 BY2H0,05 946,0--2016

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗