31/5-J-14 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 29.01.2000 to 22.02.2000 (24 days), to 4 778,0 m.
Water depth315,0 m
Total depth4 778,0 m MD
Vertical depth1 580,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud29.01.2000
Completed22.02.2000
OperatorNorsk Hydro Produksjon AS
Position60,7432 N, 3,6079 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 50 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-J-14 AY1H same well | 0,0 | 4 794,0 | - | - | 2011 |
| 31/5-J-14 AY2H same well | 0,0 | 4 975,0 | - | - | 2011 |
| 31/5-J-14 BH same well | 0,0 | 6 878,0 | - | - | 2015 |
| 31/5-J-13 AY1H | 0,0 | 4 556,0 | - | - | 2009 |
| 31/5-J-13 AY2H | 0,0 | 4 565,0 | - | - | 2009 |
| 31/5-J-13 AY3H | 0,0 | 4 904,0 | - | - | 2009 |
| 31/5-J-13 BY1H | 0,0 | 7 292,0 | - | - | 2015 |
| 31/5-J-13 BY2H | 0,0 | 5 946,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.