31/5-J-41
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 11.07.1997 to 23.07.1997 (12 days), to 1 760,0 m.
Water depth313,0 m
Total depth1 760,0 m MD
Vertical depth1 760,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud11.07.1997
Completed23.07.1997
OperatorNorsk Hydro Produksjon AS
Position60,7242 N, 3,6580 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 57 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 31/5-J-22 AY1H | 0,6 | 5 263,0 | - | - | 2011 |
| 31/5-J-22 AY2H | 0,6 | 5 242,0 | - | - | 2011 |
| 31/5-J-22 AY3H | 0,6 | 5 201,0 | - | - | 2011 |
| 31/5-J-22 Y1H | 0,6 | 4 667,0 | - | - | 2001 |
| 31/5-J-22 Y2H | 0,6 | 3 795,0 | - | - | 2001 |
| 31/5-J-24 AY1H | 0,6 | 3 607,0 | - | - | 2007 |
| 31/5-J-24 AY2H | 0,6 | 4 692,0 | - | - | 2007 |
| 31/5-J-24 AY3H | 0,6 | 4 881,0 | - | - | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.