WellplannerNorwegian shelf well data

Fields / Troll / 31/5-J-41

31/5-J-41

Development, observationPlugged

Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Troll, 11.07.1997 to 23.07.1997 (12 days), to 1 760,0 m.

Water depth313,0 m
Total depth1 760,0 m MD
Vertical depth1 760,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud11.07.1997
Completed23.07.1997
OperatorNorsk Hydro Produksjon AS
Position60,7242 N, 3,6580 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Troll gradient37,2 °C/km
Estimated at total depth from the gradient57 °C

The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
31/5-J-22 AY1H0,65 263,0--2011
31/5-J-22 AY2H0,65 242,0--2011
31/5-J-22 AY3H0,65 201,0--2011
31/5-J-22 Y1H0,64 667,0--2001
31/5-J-22 Y2H0,63 795,0--2001
31/5-J-24 AY1H0,63 607,0--2007
31/5-J-24 AY2H0,64 692,0--2007
31/5-J-24 AY3H0,64 881,0--2007

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗