Fields / Troll / 31/6-6
31/6-6
Exploration, appraisalPlugged and abandonedGas
Drilled by Den norske stats oljeselskap a.s with DEEPSEA BERGEN decom in Troll, 22.05.1984 to 29.07.1984 (68 days), to 2 293,0 m in the Hegre Group.
Water depth313,0 m
Total depth2 293,0 m MD
Vertical depth2 291,0 m TVD
Bottom-hole temperature67 °C
Max inclination-
Rotary table23,0 m
Formation at total depthHegre Group
RigDEEPSEA BERGEN decom
Spud22.05.1984
Completed29.07.1984
OperatorDen norske stats oljeselskap a.s
Position60,6992 N, 3,9346 E
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 67 °C |
| Drill-stem test at 1 567,0 m | 62 °C |
| Troll gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 77 °C |
The gradient is the median of 44 released wells in Troll with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 32/4-1 | 8,2 | 3 186,0 | 110 °C | 1,41 | 1996 |
| 31/6-5 | 11,4 | 2 082,0 | 61 °C | 1,26 | 1984 |
| 31/6-4 | 11,4 | 820,0 | 37 °C | 1,09 | 1984 |
| 31/6-A-18 | 12,8 | 1 640,0 | - | - | 1997 |
| 31/6-A-13 | 12,8 | 1 622,5 | - | - | 1997 |
| 31/6-A-19 | 12,8 | 1 644,5 | - | - | 1997 |
| 31/6-A-14 | 12,8 | 1 590,0 | - | - | 1997 |
| 31/6-A-20 | 12,8 | 1 662,0 | - | - | 1997 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 423,0 | 36" | 425,0 | - |
| Surface casing | 20" | 699,0 | 26" | 723,0 | 1,53 LOT |
| Intermediate | 13 3/8" | 1 443,0 | 17 1/2" | 1 460,0 | 1,55 LOT |
| Intermediate | 9 5/8" | 1 755,0 | 12 1/4" | 1 771,5 | 1,49 LOT |
| Open hole | - | 2 290,0 | 8 1/2" | 2 290,0 | - |
Mud weight
35 measurements, one dot each, 1,00 to 1,23 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 2 | 1 520,0 - 1 533,0 | 12,5 | 11,0 | 62 | - | 107 |
| 1 | 1 562,5 - 1 567,0 | 25,4 | - | 62 | - | 7 790 |