Fields / Gullfaks / 34/10-A-24 B
34/10-A-24 B
Development, productionClosedOil
Drilled by Statoil ASA (old) with Gullfaks A in Gullfaks, 11.04.2007 to 29.04.2007 (18 days), to 3 157,0 m.
Water depth134,3 m
Total depth3 157,0 m MD
Vertical depth1 992,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table82,0 m
Formation at total depth-
RigGullfaks A
Spud11.04.2007
Completed29.04.2007
OperatorStatoil ASA (old)
Position61,1760 N, 2,1896 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 66 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-A-24 same well | 0,0 | 3 424,0 | - | - | 1989 |
| 34/10-A-24 A same well | 0,0 | 2 608,0 | - | - | 1990 |
| 34/10-A-41 | 0,0 | 4 979,0 | - | - | 1993 |
| 34/10-A-41 A | 0,0 | 3 707,0 | - | - | 2000 |
| 34/10-A-41 B | 0,0 | 3 883,0 | - | - | 2001 |
| 34/10-A-41 C | 0,0 | 4 575,0 | - | - | 2023 |
| 34/10-A-29 | 0,0 | 3 001,0 | - | - | 1990 |
| 34/10-A-29 A | 0,0 | 3 774,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.