Fields / Gullfaks / 34/10-A-41 C
34/10-A-41 C
Development, productionInjectingWater
Drilled by Equinor Energy AS with Gullfaks A in Gullfaks, 29.04.2023 to 16.06.2023 (48 days), to 4 575,0 m.
Water depth134,0 m
Total depth4 575,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table82,2 m
Formation at total depth-
RigGullfaks A
Spud29.04.2023
Completed16.06.2023
OperatorEquinor Energy AS
Position61,1760 N, 2,1897 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 155 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-A-41 same well | 0,0 | 4 979,0 | - | - | 1993 |
| 34/10-A-41 A same well | 0,0 | 3 707,0 | - | - | 2000 |
| 34/10-A-41 B same well | 0,0 | 3 883,0 | - | - | 2001 |
| 34/10-A-24 | 0,0 | 3 424,0 | - | - | 1989 |
| 34/10-A-24 A | 0,0 | 2 608,0 | - | - | 1990 |
| 34/10-A-24 B | 0,0 | 3 157,0 | - | - | 2007 |
| 34/10-A-15 | 0,0 | 2 930,0 | - | - | 1988 |
| 34/10-A-15 A | 0,0 | 6 469,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.