WellplannerNorwegian shelf well data

Fields / Gullfaks / 34/10-B-26 AY2

34/10-B-26 AY2

Development, productionPluggedOil and gas

Drilled by Statoil ASA (old) with Gullfaks B in Gullfaks, 16.07.2007 to 28.07.2007 (12 days), to 4 007,0 m.

Water depth142,5 m
Total depth4 007,0 m MD
Vertical depth1 949,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud16.07.2007
Completed28.07.2007
OperatorStatoil ASA (old)
Position61,2028 N, 2,2018 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gullfaks gradient34,7 °C/km
Estimated at total depth from the gradient64 °C

The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/10-B-26 same well0,03 900,0--1992
34/10-B-26 A same well0,03 885,0--2004
34/10-B-26 B same well0,03 819,0--2025
34/10-B-310,04 250,0--1994
34/10-B-31 A0,03 118,0--2001
34/10-B-190,02 960,0--1991
34/10-B-19 A0,03 061,0--1992
34/10-B-100,03 352,0--1989

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗