Fields / Gullfaks / 34/10-B-26 B
34/10-B-26 B
Development, productionClosed
Drilled by Equinor Energy AS with Gullfaks B in Gullfaks, 03.09.2025 to 02.10.2025 (29 days), to 3 819,0 m.
Water depth142,5 m
Total depth3 819,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud03.09.2025
Completed02.10.2025
OperatorEquinor Energy AS
Position61,2028 N, 2,2018 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 129 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-B-26 same well | 0,0 | 3 900,0 | - | - | 1992 |
| 34/10-B-26 A same well | 0,0 | 3 885,0 | - | - | 2004 |
| 34/10-B-26 AY2 same well | 0,0 | 4 007,0 | - | - | 2007 |
| 34/10-B-31 | 0,0 | 4 250,0 | - | - | 1994 |
| 34/10-B-31 A | 0,0 | 3 118,0 | - | - | 2001 |
| 34/10-B-19 | 0,0 | 2 960,0 | - | - | 1991 |
| 34/10-B-19 A | 0,0 | 3 061,0 | - | - | 1992 |
| 34/10-B-10 | 0,0 | 3 352,0 | - | - | 1989 |
Casing and formation tests
No casing programme is reported for this wellbore.