Fields / Gullfaks / 34/10-B-6 A
34/10-B-6 A
Development, productionProducing
Drilled by Equinor Energy AS with Gullfaks B in Gullfaks, 29.08.2024 to 12.01.2025 (136 days), to 3 536,0 m.
Water depth142,5 m
Total depth3 536,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud29.08.2024
Completed12.01.2025
OperatorEquinor Energy AS
Position61,2027 N, 2,2018 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 119 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-B-6 same well | 0,0 | 2 594,0 | - | - | 1989 |
| 34/10-B-7 | 0,0 | 2 500,0 | - | - | 1989 |
| 34/10-B-7 A | 0,0 | 4 139,0 | - | - | 2002 |
| 34/10-B-7 B | 0,0 | 4 469,0 | - | - | 2006 |
| 34/10-B-7 C | 0,0 | 4 685,0 | - | - | 2008 |
| 34/10-B-7 D | 0,0 | 4 625,0 | - | - | 2013 |
| 34/10-B-21 | 0,0 | 2 770,0 | - | - | 1992 |
| 34/10-B-21 A | 0,0 | 2 700,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.