Fields / Gullfaks / 34/10-B-7 C
34/10-B-7 C
Development, injectionPluggedWater
Drilled by StatoilHydro ASA with Gullfaks B in Gullfaks, 18.08.2008 to 06.09.2008 (19 days), to 4 685,0 m.
Water depth142,5 m
Total depth4 685,0 m MD
Vertical depth1 970,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table80,7 m
Formation at total depth-
RigGullfaks B
Spud18.08.2008
Completed06.09.2008
OperatorStatoilHydro ASA
Position61,2028 N, 2,2018 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks gradient | 34,7 °C/km |
| Estimated at total depth from the gradient | 65 °C |
The gradient is the median of 18 released wells in Gullfaks with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-B-7 same well | 0,0 | 2 500,0 | - | - | 1989 |
| 34/10-B-7 A same well | 0,0 | 4 139,0 | - | - | 2002 |
| 34/10-B-7 B same well | 0,0 | 4 469,0 | - | - | 2006 |
| 34/10-B-7 D same well | 0,0 | 4 625,0 | - | - | 2013 |
| 34/10-B-33 | 0,0 | 5 050,0 | - | - | 1995 |
| 34/10-B-33 A | 0,0 | 5 313,0 | - | - | 2015 |
| 34/10-B-6 | 0,0 | 2 594,0 | - | - | 1989 |
| 34/10-B-6 A | 0,0 | 3 536,0 | - | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.