Fields / Gullfaks Sør / 34/10-J-1 H
34/10-J-1 H
Development, injectionPluggedGas
Drilled by Den norske stats oljeselskap a.s with Trans. Wildcat in Gullfaks Sør, 11.06.1997 to 26.07.1997 (45 days), to 4 459,0 m.
Water depth136,0 m
Total depth4 459,0 m MD
Vertical depth3 068,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigTrans. Wildcat
Spud11.06.1997
Completed26.07.1997
OperatorDen norske stats oljeselskap a.s
Position61,0640 N, 2,0030 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gullfaks Sør gradient | 36,5 °C/km |
| Estimated at total depth from the gradient | 110 °C |
The gradient is the median of 24 released wells in Gullfaks Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/10-J-1 AH same well | 0,0 | 7 511,0 | - | - | 2021 |
| 34/10-J-1 BH same well | 0,0 | 7 503,0 | - | - | 2021 |
| 34/10-44 S | 0,0 | 4 865,0 | - | 1,60 | 2001 |
| 34/10-J-4 H | 0,0 | 4 865,0 | - | - | 2001 |
| 34/10-J-5 AH | 0,0 | 4 931,0 | - | - | 2002 |
| 34/10-J-5 H | 0,0 | 5 350,0 | - | - | 2002 |
| 34/10-J-2 H | 0,0 | 5 790,0 | - | - | 2000 |
| 34/10-J-3 AH | 0,0 | 5 950,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.