WellplannerNorwegian shelf well data

Fields / Gullfaks Sør / 34/10-J-5 AH

34/10-J-5 AH

Development, injectionClosedGas

Drilled by Statoil ASA (old) with Deepsea Trym in Gullfaks Sør, 12.12.2002 to 23.12.2002 (11 days), to 4 931,0 m.

Water depth137,0 m
Total depth4 931,0 m MD
Vertical depth3 332,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigDeepsea Trym
Spud12.12.2002
Completed23.12.2002
OperatorStatoil ASA (old)
Position61,0640 N, 2,0029 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Gullfaks Sør gradient36,5 °C/km
Estimated at total depth from the gradient120 °C

The gradient is the median of 24 released wells in Gullfaks Sør with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/10-J-5 H same well0,05 350,0--2002
34/10-J-2 H0,05 790,0--2000
34/10-J-1 AH0,07 511,0--2021
34/10-J-1 BH0,07 503,0--2021
34/10-J-1 H0,04 459,0--1997
34/10-J-3 AH0,05 950,0--2021
34/10-J-3 H0,03 496,0--2000
34/10-44 S0,04 865,0-1,602001

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗