34/11-B-3
Development, productionProducingGas
Drilled by Statoil Petroleum AS with West Elara in Valemon, 29.04.2015 to 22.06.2015 (54 days), to 5 571,0 m.
Water depth133,5 m
Total depth5 571,0 m MD
Vertical depth4 143,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table53,7 m
Formation at total depth-
RigWest Elara
Spud29.04.2015
Completed22.06.2015
OperatorStatoil Petroleum AS
Position61,0408 N, 2,3388 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valemon gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 147 °C |
The gradient is the median of 5 released wells in Valemon with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/11-B-7 | 0,0 | 5 736,0 | - | - | 2014 |
| 34/11-B-7 A | 0,0 | 7 328,0 | - | - | 2023 |
| 34/11-B-8 | 0,0 | 1 314,0 | - | - | 2014 |
| 34/11-B-2 | 0,0 | 6 008,0 | - | - | 2014 |
| 34/11-B-12 | 0,0 | 5 406,0 | - | - | 2012 |
| 34/11-B-9 | 0,0 | 5 904,0 | - | - | 2015 |
| 34/11-B-9 A | 0,0 | 6 116,0 | - | - | 2017 |
| 34/11-B-13 | 0,0 | 4 810,0 | - | - | 2012 |
Casing and formation tests
No casing programme is reported for this wellbore.