WellplannerNorwegian shelf well data

Fields / Valemon / 34/11-B-8

34/11-B-8

Development, injectionInjectingWater

Drilled by Statoil Petroleum AS with West Elara in Valemon, 23.01.2014 to 07.02.2014 (15 days), to 1 314,0 m.

Water depth133,5 m
Total depth1 314,0 m MD
Vertical depth1 058,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table54,2 m
Formation at total depth-
RigWest Elara
Spud23.01.2014
Completed07.02.2014
OperatorStatoil Petroleum AS
Position61,0408 N, 2,3388 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valemon gradient36,2 °C/km
Estimated at total depth from the gradient36 °C

The gradient is the median of 5 released wells in Valemon with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/11-B-30,05 571,0--2015
34/11-B-90,05 904,0--2015
34/11-B-9 A0,06 116,0--2017
34/11-B-70,05 736,0--2014
34/11-B-7 A0,07 328,0--2023
34/11-B-20,06 008,0--2014
34/11-B-130,04 810,0--2012
34/11-B-13 A0,05 022,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗