34/11-B-8
Development, injectionInjectingWater
Drilled by Statoil Petroleum AS with West Elara in Valemon, 23.01.2014 to 07.02.2014 (15 days), to 1 314,0 m.
Water depth133,5 m
Total depth1 314,0 m MD
Vertical depth1 058,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table54,2 m
Formation at total depth-
RigWest Elara
Spud23.01.2014
Completed07.02.2014
OperatorStatoil Petroleum AS
Position61,0408 N, 2,3388 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valemon gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 36 °C |
The gradient is the median of 5 released wells in Valemon with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/11-B-3 | 0,0 | 5 571,0 | - | - | 2015 |
| 34/11-B-9 | 0,0 | 5 904,0 | - | - | 2015 |
| 34/11-B-9 A | 0,0 | 6 116,0 | - | - | 2017 |
| 34/11-B-7 | 0,0 | 5 736,0 | - | - | 2014 |
| 34/11-B-7 A | 0,0 | 7 328,0 | - | - | 2023 |
| 34/11-B-2 | 0,0 | 6 008,0 | - | - | 2014 |
| 34/11-B-13 | 0,0 | 4 810,0 | - | - | 2012 |
| 34/11-B-13 A | 0,0 | 5 022,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.