Fields / 34/7-31
34/7-31
Exploration, appraisalPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Scarabeo 6, 10.03.2001 to 13.04.2001 (34 days), to 2 650,0 m in the Tarbert Formation.
Water depth207,0 m
Total depth2 650,0 m MD
Vertical depth2 650,0 m TVD
Bottom-hole temperature97 °C
Max inclination2,4°
Rotary table26,0 m
Formation at total depthTarbert Formation
RigScarabeo 6
Spud10.03.2001
Completed13.04.2001
OperatorNorsk Hydro Produksjon AS
Position61,3105 N, 2,0666 E
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 97 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-31 A same well | 0,0 | 3 454,0 | 89 °C | 1,51 | 2001 |
| 34/7-F-2 H | 1,1 | 4 598,0 | - | - | 2012 |
| 34/7-F-1 H | 1,1 | 4 817,0 | - | - | 2004 |
| 34/7-F-4 H | 1,1 | 5 461,0 | - | - | 2007 |
| 34/7-F-3 AH | 1,1 | - | - | - | - |
| 34/7-F-3 H | 1,1 | 5 213,0 | - | - | 2003 |
| 34/7-33 | 1,8 | 2 615,0 | 86 °C | 1,58 | 2008 |
| 34/7-U-17 | 1,8 | 1 110,0 | - | - | 2008 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 306,0 | 36" | 306,0 | - |
| Surface casing | 20" | 1 144,0 | 26" | 1 144,0 | 1,83 LOT |
| Intermediate | 13 3/8" | 1 779,0 | 17 1/2" | 1 785,0 | 1,82 LOT |
| Open hole | - | 2 650,0 | 8 1/2" | 2 650,0 | - |
Mud weight
8 measurements, one dot each, 1,00 to 1,62 g/cm³ against measured depth, water based.