34/7-F-2 H
Development, injectionClosedWater
Drilled by Statoil Petroleum AS with Bideford Dolphin in Vigdis, 21.06.2012 to 22.07.2012 (31 days), to 4 598,0 m.
Water depth219,0 m
Total depth4 598,0 m MD
Vertical depth2 523,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud21.06.2012
Completed22.07.2012
OperatorStatoil Petroleum AS
Position61,3206 N, 2,0667 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Vigdis gradient | 37,7 °C/km |
| Estimated at total depth from the gradient | 90 °C |
The gradient is the median of 12 released wells in Vigdis with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-F-1 H | 0,0 | 4 817,0 | - | - | 2004 |
| 34/7-F-4 H | 0,0 | 5 461,0 | - | - | 2007 |
| 34/7-F-3 AH | 0,0 | - | - | - | - |
| 34/7-F-3 H | 0,0 | 5 213,0 | - | - | 2003 |
| 34/7-31 | 1,1 | 2 650,0 | 97 °C | 1,62 | 2001 |
| 34/7-31 A | 1,1 | 3 454,0 | 89 °C | 1,51 | 2001 |
| 34/7-33 | 1,6 | 2 615,0 | 86 °C | 1,58 | 2008 |
| 34/7-U-17 | 1,6 | 1 110,0 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.