34/7-34
Exploration, wildcatPlugged and abandonedOil
Drilled by StatoilHydro Petroleum AS with Borgland Dolphin in Vigdis, 14.02.2009 to 10.03.2009 (24 days), to 2 701,0 m in the Lunde Formation.
Water depth292,0 m
Total depth2 701,0 m MD
Vertical depth2 701,0 m TVD
Bottom-hole temperature95 °C
Max inclination0,3°
Rotary table31,0 m
Formation at total depthLunde Formation
RigBorgland Dolphin
Spud14.02.2009
Completed10.03.2009
OperatorStatoilHydro Petroleum AS
Position61,3896 N, 2,1423 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 95 °C |
| Vigdis gradient | 37,7 °C/km |
| Estimated at total depth from the gradient | 94 °C |
The gradient is the median of 12 released wells in Vigdis with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-34 A same well | 0,0 | 3 022,0 | - | 1,62 | 2009 |
| 34/7-U-18 | 0,0 | 700,0 | - | - | 2009 |
| 34/7-H-2 AH | 0,1 | 3 554,0 | - | - | 2013 |
| 34/7-H-2 BH | 0,1 | 3 705,0 | - | - | 2013 |
| 34/7-H-2 H | 0,1 | 4 364,0 | - | - | 2012 |
| 34/7-H-3 H | 0,1 | 3 186,0 | - | - | 2012 |
| 34/7-H-1 AH | 0,1 | 7 030,0 | - | - | 2024 |
| 34/7-H-1 H | 0,1 | 5 480,0 | - | - | 2012 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 383,0 | 36" | 386,0 | - |
| Surface casing | 13 3/8" | 1 184,0 | 17 1/2" | 1 189,0 | 1,57 LOT |
| Intermediate | 9 5/8" | 2 106,0 | 12 1/4" | 2 111,0 | 1,78 LOT |
| Open hole | - | 2 701,0 | 8 1/2" | 2 701,0 | - |
Mud weight
11 measurements, one dot each, 1,30 to 1,66 g/cm³ against measured depth, kcl/polymer/gem, obm-low ecd.