Fields / 34/7-H-2 H
34/7-H-2 H
Development, observationPluggedOil
Drilled by Statoil Petroleum AS with Bideford Dolphin, 29.04.2012 to 03.05.2013 (369 days), to 4 364,0 m.
Water depth292,0 m
Total depth4 364,0 m MD
Vertical depth2 578,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud29.04.2012
Completed03.05.2013
OperatorStatoil Petroleum AS
Position61,3893 N, 2,1413 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-H-2 AH same well | 0,0 | 3 554,0 | - | - | 2013 |
| 34/7-H-2 BH same well | 0,0 | 3 705,0 | - | - | 2013 |
| 34/7-H-3 H | 0,0 | 3 186,0 | - | - | 2012 |
| 34/7-H-1 AH | 0,0 | 7 030,0 | - | - | 2024 |
| 34/7-H-1 H | 0,0 | 5 480,0 | - | - | 2012 |
| 34/7-H-4 H | 0,0 | 4 699,0 | - | - | 2013 |
| 34/7-34 | 0,1 | 2 701,0 | 95 °C | 1,66 | 2009 |
| 34/7-34 A | 0,1 | 3 022,0 | - | 1,62 | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.