Development, observationPluggedOil

Drilled by Statoil Petroleum AS with Bideford Dolphin, 29.04.2012 to 03.05.2013 (369 days), to 4 364,0 m.

Water depth292,0 m
Total depth4 364,0 m MD
Vertical depth2 578,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBideford Dolphin
Spud29.04.2012
Completed03.05.2013
OperatorStatoil Petroleum AS
Position61,3893 N, 2,1413 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/7-H-2 AH same well0,03 554,0--2013
34/7-H-2 BH same well0,03 705,0--2013
34/7-H-3 H0,03 186,0--2012
34/7-H-1 AH0,07 030,0--2024
34/7-H-1 H0,05 480,0--2012
34/7-H-4 H0,04 699,0--2013
34/7-340,12 701,095 °C1,662009
34/7-34 A0,13 022,0-1,622009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗