Fields / 34/7-35 S
34/7-35 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Statoil Petroleum AS with Ocean Vanguard, 08.05.2012 to 22.07.2012 (75 days), to 4 393,0 m in the Ness Formation.
Water depth262,0 m
Total depth4 393,0 m MD
Vertical depth3 710,0 m TVD
Bottom-hole temperature-
Max inclination57,7°
Rotary table22,0 m
Formation at total depthNess Formation
RigOcean Vanguard
Spud08.05.2012
Completed22.07.2012
OperatorStatoil Petroleum AS
Position61,3011 N, 2,2053 E
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-U-19 | 0,0 | 1 120,0 | - | - | 2012 |
| 34/7-2 | 2,4 | 2 475,0 | 92 °C | 1,80 | 1984 |
| 34/7-J-7 AH | 2,5 | 2 800,0 | - | - | 1997 |
| 34/7-J-7 H | 2,5 | 2 585,0 | - | - | 1997 |
| 34/7-22 | 3,1 | 2 507,0 | 92 °C | 1,66 | 1993 |
| 34/7-30 S | 4,8 | 1 148,0 | - | 1,20 | 1999 |
| 34/7-30 SR | 4,8 | 2 478,0 | 73 °C | 1,60 | 1999 |
| 34/7-U-13 | 5,1 | - | - | - | - |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 347,0 | 36" | 351,0 | - |
| Pilot hole | - | 351,0 | 9 7/8" | 351,0 | - |
| Surface casing | 20" | 1 094,0 | 26" | 1 104,0 | 1,53 FIT |
| Intermediate | 13 3/8" | 2 005,0 | 17 1/2" | 2 015,0 | 1,83 LOT |
| Liner | 9 5/8" | 3 974,0 | 12 1/4" | 3 076,0 | 1,76 FIT |
| Open hole | - | 4 393,0 | 8 1/2" | 4 393,0 | - |
Mud weight
18 measurements, one dot each, 1,30 to 1,62 g/cm³ against measured depth, performadril, spud mud, xp-07 - #14.