34/7-P-14 B
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with Snorre A in Snorre, 08.04.2002 to 28.04.2002 (20 days), to 4 775,0 m.
Water depth309,0 m
Total depth4 775,0 m MD
Vertical depth2 590,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,4 m
Formation at total depth-
RigSnorre A
Spud08.04.2002
Completed28.04.2002
OperatorNorsk Hydro Produksjon AS
Position61,4492 N, 2,1437 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Snorre gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 84 °C |
The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-P-14 same well | 0,0 | 3 667,0 | - | - | 1994 |
| 34/7-P-14 AY1 same well | 0,0 | 4 552,0 | - | - | 1994 |
| 34/7-P-14 AY2 same well | 0,0 | 3 373,0 | - | - | 1998 |
| 34/7-P-14 C same well | 0,0 | 4 296,0 | - | - | 2017 |
| 34/7-P-15 | 0,0 | 6 326,0 | - | - | 2002 |
| 34/7-P-15 A | 0,0 | 5 215,0 | - | - | 2019 |
| 34/7-P-13 | 0,0 | 3 830,0 | - | - | 1991 |
| 34/7-P-19 | 0,0 | 5 710,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.