WellplannerNorwegian shelf well data

Fields / Snorre / 34/7-P-15

34/7-P-15

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Snorre A in Snorre, 15.06.2002 to 21.07.2002 (36 days), to 6 326,0 m.

Water depth309,0 m
Total depth6 326,0 m MD
Vertical depth2 832,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,4 m
Formation at total depth-
RigSnorre A
Spud15.06.2002
Completed21.07.2002
OperatorNorsk Hydro Produksjon AS
Position61,4492 N, 2,1438 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Snorre gradient36,2 °C/km
Estimated at total depth from the gradient93 °C

The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/7-P-15 A same well0,05 215,0--2019
34/7-P-100,06 765,0--2003
34/7-P-10 A0,05 600,0--2008
34/7-P-140,03 667,0--1994
34/7-P-14 AY10,04 552,0--1994
34/7-P-14 AY20,03 373,0--1998
34/7-P-14 B0,04 775,0--2002
34/7-P-14 C0,04 296,0--2017

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗