34/7-P-16
Development, injectionPluggedWater
Drilled by Norsk Hydro Produksjon AS with Snorre A in Snorre, 30.11.2001 to 26.01.2002 (57 days), to 6 655,0 m.
Water depth309,0 m
Total depth6 655,0 m MD
Vertical depth3 026,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,4 m
Formation at total depth-
RigSnorre A
Spud30.11.2001
Completed26.01.2002
OperatorNorsk Hydro Produksjon AS
Position61,4492 N, 2,1435 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Snorre gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 100 °C |
The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-P-16 A same well | 0,0 | 7 128,0 | - | - | 2021 |
| 34/7-P-17 | 0,0 | 5 030,0 | - | - | 1993 |
| 34/7-P-17 A | 0,0 | 5 757,0 | - | - | 2011 |
| 34/7-P-17 B | 0,0 | 5 695,0 | - | - | 2025 |
| 34/7-P-11 | 0,0 | 5 880,0 | - | - | 1994 |
| 34/7-P-11 A | 0,0 | 5 000,0 | - | - | 2001 |
| 34/7-P-11 B | 0,0 | 5 568,0 | - | - | 2022 |
| 34/7-P-12 | 0,0 | 4 114,0 | - | - | 1994 |
Casing and formation tests
No casing programme is reported for this wellbore.