34/7-P-17 B
Development, injectionInjectingWater
Drilled by Equinor Energy AS with Snorre A in Snorre, 09.05.2025 to 16.06.2025 (38 days), to 5 695,0 m.
Water depth368,4 m
Total depth5 695,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table59,4 m
Formation at total depth-
RigSnorre A
Spud09.05.2025
Completed16.06.2025
OperatorEquinor Energy AS
Position61,4492 N, 2,1436 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Snorre gradient | 36,2 °C/km |
| Estimated at total depth from the gradient | 195 °C |
The gradient is the median of 12 released wells in Snorre with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/7-P-17 same well | 0,0 | 5 030,0 | - | - | 1993 |
| 34/7-P-17 A same well | 0,0 | 5 757,0 | - | - | 2011 |
| 34/7-P-18 | 0,0 | 3 275,0 | - | - | 1991 |
| 34/7-P-18 A | 0,0 | 3 283,0 | - | - | 1997 |
| 34/7-P-16 | 0,0 | 6 655,0 | - | - | 2001 |
| 34/7-P-16 A | 0,0 | 7 128,0 | - | - | 2021 |
| 34/7-P-12 | 0,0 | 4 114,0 | - | - | 1994 |
| 34/7-P-12 A | 0,0 | 5 475,0 | - | - | 2013 |