Fields / Visund Sør / 34/8-14 A
34/8-14 A
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by StatoilHydro ASA with Borgland Dolphin in Visund Sør, 29.10.2008 to 01.12.2008 (33 days), to 3 838,0 m in the Drake Formation.
Water depth292,0 m
Total depth3 838,0 m MD
Vertical depth3 075,2 m TVD
Bottom-hole temperature113 °C
Max inclination58,4°
Rotary table31,0 m
Formation at total depthDrake Formation
RigBorgland Dolphin
Spud29.10.2008
Completed01.12.2008
OperatorStatoilHydro ASA
Position61,3105 N, 2,3425 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 113 °C |
2 released wells in Visund Sør report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-14 B same well | 0,0 | 4 079,0 | - | 1,60 | 2008 |
| 34/8-14 C same well | 0,0 | 3 820,0 | - | 1,60 | 2008 |
| 34/8-14 D same well | 0,0 | 3 850,0 | - | 1,60 | 2009 |
| 34/8-14 S same well | 0,0 | 3 470,0 | 115 °C | 1,60 | 2008 |
| 34/8-U-3 | 1,5 | - | - | - | 2011 |
| 34/8-V-3 H | 1,6 | 4 581,0 | - | - | 2013 |
| 34/8-V-2 AH | 1,6 | 5 370,0 | - | - | 2023 |
| 34/8-V-2 H | 1,6 | 5 465,0 | - | - | 2014 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Intermediate | 9 5/8" | 2 239,0 | 12 1/4" | 2 246,0 | - |
| Open hole | - | 3 838,0 | 8 1/2" | 3 838,0 | - |
Mud weight
7 measurements, one dot each, 1,30 to 1,60 g/cm³ against measured depth, obm-low ecd.