34/8-V-2 H
Development, productionPluggedGas and condensate
Drilled by Statoil Petroleum AS with Scarabeo 5 in Visund, 12.04.2014 to 28.07.2014 (107 days), to 5 465,0 m.
Water depth291,0 m
Total depth5 465,0 m MD
Vertical depth2 813,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud12.04.2014
Completed28.07.2014
OperatorStatoil Petroleum AS
Position61,3006 N, 2,3636 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-V-2 AH same well | 0,0 | 5 370,0 | - | - | 2023 |
| 34/8-V-3 H | 0,0 | 4 581,0 | - | - | 2013 |
| 34/8-V-1 AH | 0,0 | 5 160,0 | - | - | 2014 |
| 34/8-V-1 BH | 0,0 | 3 629,5 | - | - | 2026 |
| 34/8-V-1 H | 0,0 | 3 345,0 | - | - | 2013 |
| 34/8-V-4 AH | 0,0 | 4 160,0 | - | - | 2011 |
| 34/8-V-4 BY1H | 0,0 | 4 721,0 | - | - | 2012 |
| 34/8-V-4 BY2H | 0,0 | 4 815,0 | - | - | 2012 |
Casing and formation tests
No casing programme is reported for this wellbore.