Fields / Visund / 34/8-5
34/8-5
Exploration, appraisalPlugged and abandonedShows
Drilled by Norsk Hydro Produksjon AS with Transocean 8 in Visund, 18.02.1991 to 01.04.1991 (42 days), to 3 540,0 m in the Lunde Formation.
Water depth297,0 m
Total depth3 540,0 m MD
Vertical depth3 528,0 m TVD
Bottom-hole temperature113 °C
Max inclination10,5°
Rotary table23,0 m
Formation at total depthLunde Formation
RigTransocean 8
Spud18.02.1991
Completed01.04.1991
OperatorNorsk Hydro Produksjon AS
Position61,3250 N, 2,3494 E
Formations
30 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 113 °C |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 131 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 34/8-14 A | 1,6 | 3 838,0 | 113 °C | 1,60 | 2008 |
| 34/8-14 B | 1,6 | 4 079,0 | - | 1,60 | 2008 |
| 34/8-14 C | 1,6 | 3 820,0 | - | 1,60 | 2008 |
| 34/8-14 D | 1,6 | 3 850,0 | - | 1,60 | 2009 |
| 34/8-14 S | 1,6 | 3 470,0 | 115 °C | 1,60 | 2008 |
| 34/8-9 S | 2,4 | 3 530,0 | 118 °C | 1,67 | 1992 |
| 34/8-U-3 | 2,8 | - | - | - | 2011 |
| 34/8-V-3 H | 2,8 | 4 581,0 | - | - | 2013 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 406,0 | 36" | 406,0 | - |
| Intermediate | 13 3/8" | 1 186,0 | 17 1/2" | 1 197,0 | 1,53 LOT |
| Intermediate | 9 5/8" | 2 600,0 | 12 1/4" | 2 612,0 | 1,82 LOT |
| Open hole | - | 3 540,0 | 8 1/2" | 3 540,0 | - |
Mud weight
37 measurements, one dot each, 1,00 to 1,61 g/cm³ against measured depth, water based.