WellplannerNorwegian shelf well data

Fields / Visund / 34/8-A-5 BH

34/8-A-5 BH

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Visund in Visund, 07.07.2000 to 25.07.2000 (18 days), to 6 275,0 m.

Water depth335,0 m
Total depth6 275,0 m MD
Vertical depth3 106,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud07.07.2000
Completed25.07.2000
OperatorNorsk Hydro Produksjon AS
Position61,3703 N, 2,4594 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Visund gradient39,6 °C/km
Estimated at total depth from the gradient112 °C

The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/8-A-5 AH same well0,05 659,0--2000
34/8-A-5 CH same well0,06 118,0--2000
34/8-A-5 H same well0,04 413,0--2000
34/8-A-4 AH0,07 651,0--2002
34/8-A-4 BH0,07 579,0--2006
34/8-A-4 H0,05 658,0--2002
34/8-A-6 AH0,09 082,0--2005
34/8-A-6 H0,08 170,0--2004

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗