34/8-A-6 H
Development, observationPlugged
Drilled by Statoil ASA (old) with Visund in Visund, 22.10.2004 to 06.05.2005 (196 days), to 8 170,0 m.
Water depth335,0 m
Total depth8 170,0 m MD
Vertical depth2 982,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud22.10.2004
Completed06.05.2005
OperatorStatoil ASA (old)
Position61,3703 N, 2,4592 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 108 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-6 AH same well | 0,0 | 9 082,0 | - | - | 2005 |
| 34/8-A-7 AH | 0,0 | - | - | - | - |
| 34/8-A-7 H | 0,0 | 3 642,0 | - | - | 1997 |
| 34/8-A-5 AH | 0,0 | 5 659,0 | - | - | 2000 |
| 34/8-A-5 BH | 0,0 | 6 275,0 | - | - | 2000 |
| 34/8-A-5 CH | 0,0 | 6 118,0 | - | - | 2000 |
| 34/8-A-5 H | 0,0 | 4 413,0 | - | - | 2000 |
| 34/8-A-34 H | 0,0 | 7 458,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.